Quick answer

With the EQB in Park, off and unlocked, open both CCS inlet sections, authorize the station, insert the DC connector fully and confirm charging on both the station and vehicle displays.

Before you start

Check that your vehicle has it.

Availability

Verified for 2024 U.S. EQB electric models at compatible CCS DC fast-charging stations; station access, payment and maximum power depend on the provider and conditions.

Required equipment / service
EQB 250+, EQB 300 4MATIC and EQB 350 4MATIC with CCS DC fast-charging inlet
Compatibility check

Does the documented scope match your car?

This check combines the verified year, any source-supported powertrain scope, source-named trim/package and required equipment. It does not read a VIN or factory build record.

Source-named equipment or service
  • EQB 250+, EQB 300 4MATIC and EQB 350 4MATIC with CCS DC fast-charging inlet
Can you see the required control, menu or equipment on your vehicle?
Published availability and qualifications

Verified for 2024 U.S. EQB electric models at compatible CCS DC fast-charging stations; station access, payment and maximum power depend on the provider and conditions.

Visual orientation

Know what kind of control to look for.

This original category diagram is an orientation aid, not a picture of your exact trim. Use the written labels and your vehicle manual to identify the real control.

Electric charging orientation diagram for Mercedes-Benz EQB
Electric charging orientationOriginal visual guide · controls vary by trim · not to scale
How to use it

Step by step.

  1. 01

    Park close enough that the station cable is not stretched, shift to Park, switch the vehicle off and unlock it.

  2. 02

    Open the charge-port flap and open both the upper and lower inlet covers required by the CCS connector.

  3. 03

    Follow the charging-station instructions to authorize the session, then insert the CCS connector completely into the vehicle socket.

  4. 04

    Keep the cable free of tension and wait for the vehicle indicator to show that communication is established and energy is flowing.

  5. 05

    Verify charging power and the predicted charge level or completion time on the vehicle or station display.

!

Important limits

  • Both sections of the CCS inlet must be open; do not force the connector.
  • Charging power varies with battery temperature, state of charge, station output and battery condition.
  • The station's delivered-energy figure can exceed energy stored in the battery because of charging losses.
If it does not work

Quick checks.

  • ✓If authorization fails, retry with the station app, RFID card or payment method specified by the operator.
  • ✓If the connector will not latch, remove it, check for contamination and reinsert it straight without tension.
  • ✓A red vehicle indicator means charging is unavailable; end the session and consult the station operator or Mercedes-Benz support if the fault remains.
Owner feedback

What happened on your vehicle?

Your response is stored on this device. If you separately allow analytics, a non-account-linked guide/result event may also be measured. No VIN or personal information is requested.

Primary evidence

2024 Mercedes-Benz EQB Owner's Manual — Starting the DC Charging Process

Relevant section or page: Driving and parking — DC charging and charge-port indicators. We use the written official source to determine the steps and applicability shown above.

Open official source ↗
Editorial record

Reviewed with a visible trail.

Scope and steps were checked by Car Cheat Codes Editorial Review. A guide is narrowed or corrected when the source does not support a broader claim.

Published
Last modified
Source checked
Guide change history
  • Initial verified publication.